Important
The SingleStore 9.1 release candidate (RC) is available now. It will be promoted to general availability (GA) soon and at that time it will be renamed to SingleStore 10.
In the interim, SingleStore 9.1 RC can be used to preview, evaluate, and provide feedback on the new and upcoming features in SingleStore 10, while SingleStore 9.0 is recommended for production workloads.
SHOW GC STATUS
On this page
Shows the status of the Garbage Collection (GC) object.
Syntax
SHOW GC STATUS;
Output
|
Column |
Description |
|---|---|
|
WorkerID |
ID of the thread (default number of threads is 2) |
|
Table |
Shows the tables GC is running on. |
|
Index |
Shows the index of the tables. |
|
Operation |
Operation status. |
|
Elapsed(ms) |
The amount of time the GC has taken to run. |
|
Progress% |
The percentage completed. |
Example
singlestore> SHOW GC STATUS;+-----------+-------+-------+-----------+--------------+------------+| Worker ID | Table | Index | Operation | Elapsed (ms) | Progress % |+-----------+-------+-------+-----------+--------------+------------+| 0 | NULL | NULL | NULL | NULL | NULL || 1 | NULL | NULL | NULL | NULL | NULL |+-----------+-------+-------+-----------+--------------+------------+2 rows in set (0.00 sec)
Last modified: